This was an intense two days, thanks to the assistance and prodding from my cousin, Steve. Steve's a DIY'er, having completed many projects in their own home. It so happened that he was going to be in So Cal for a family trip and he graciously offered to help me out at the condo. I jumped at the offer.

With his help, we smoothed out the bumpy concrete between the dining and family room, fixed a leaky angle stop (that's a whole other story), installed the vanity and countertop, faucet, light fixture, mirror, medicine cabinet, towel bar; organized my tools and supplies; and encouraged me to keep going. Thanks Steve!

After he rolled out of town, I finished the bathroom by installing the toilet and a doorstop. All I have to do now is buy and install a recessed toilet paper holder and it will be complete.

Comments

Popular posts from this blog

Tile prep: The Challenge of Cutting Curves

I successfully made all of the straight cuts on the tiles but it was quite a process. After the first few cuts, I decided I would gradually cut my way towards the cut line. I kept cutting away portions of the tile until I got to where I wanted it to be. This worked quite well. All was going well until I had to start cutting the hole out of the tile to make way for the toilet. A Home Depot employee recommended I use a diamond tipped blade for a jig saw to make the cut. This way, it'll go faster and still be able to guide the cut along the curve. It didn't work very well. The blade barely got through the tile. I had to lean on the saw to get it to move, which it hardly did. It got so tiring I had to start taking breaks. Well, at one point as I lifted the saw away, the tile snapped in half! I stood there in shock! The tile had suddenly broken-debris flying onto the ground. That's when I thought I'm really glad I take safety precautions like wearing eye protecti...

I poured 100 lbs of concrete!

Custom Building Products  is the name of the company who produces all of the flooring materials I have used so far. They include the waterproofing membrane, primer and concrete. I want to give a shout out to their technical support hotline at 800-272-8786. Prior to executing each step, I've called and consulted with the technical advisers at Custom. They've always been available, easy to talk to and given me direction and reassurance on how to execute each step. I am so thankful for their availability and assistance! First I applied the two different coats of waterproofing membrane. Second I applied a primer. Both of these steps were really easy. All I had to do was roll the liquids onto the floor. The waterproof membrane Finally, it was time to pour the concrete! I was most excited about this step because I've only done this once before, when I was a kid. I felt pouring concrete would be a great achievement in my DIY experience. Again, the guys at Custom gave...

Bunk Bed Completed!

We finished painting the bunk bed and we think it looks great! The paint went on really well and it feels nice and smooth. The bunk is held together by 4 inch lag bolts and I was not looking forward to having to wrench down each one of them by hand. So I asked good 'ole trusty Google if some sort of impact driver socket adapter existed. Lo and behold, yes! I found a cheap  adapter at Harbor Freight for $3 and it worked out quite well. I'd recommend getting a nicer one if you're going to be installing as part of your profession but if it's going to be a one off thing then this a great bet. It took about an hour for the four of us to assemble it (yes, I put the kids to work).