Completed interior doors, cabinet doors fixed

Allison and I finished painting the doors! It took some time because we had to fix some blemishes but we got it done and they look great!



We also fixed our cabinet door problems. We think we installed the corner cabinets upside down, which put the doors on the wrong sides. Allison and I dry fitted the door on the right side and they appeared to work with the other doors. Also, we discovered the new side had predrilled holes for the cabinet hinges so all I had to do unscrew them from the left side and screw them into the right side. We made the switch and reinstalled the doors and voila! It all worked! Praise the Lord!


I took the pull that was now upside down and on the wrong side and reinstalled it in the proper position. I patched the holes with spackle and so far, you can't tell there were holes there.

We also dry fitted the vanity in the bathroom.


Next up, I need to paint a used bunk bed we bought for the kids, buy a vanity top for the vanity, figure out how to build and hang a frame for the pre-existing and large bathroom mirror and install the new light fixture.

Comments

Popular posts from this blog

Tile prep: The Challenge of Cutting Curves

I successfully made all of the straight cuts on the tiles but it was quite a process. After the first few cuts, I decided I would gradually cut my way towards the cut line. I kept cutting away portions of the tile until I got to where I wanted it to be. This worked quite well. All was going well until I had to start cutting the hole out of the tile to make way for the toilet. A Home Depot employee recommended I use a diamond tipped blade for a jig saw to make the cut. This way, it'll go faster and still be able to guide the cut along the curve. It didn't work very well. The blade barely got through the tile. I had to lean on the saw to get it to move, which it hardly did. It got so tiring I had to start taking breaks. Well, at one point as I lifted the saw away, the tile snapped in half! I stood there in shock! The tile had suddenly broken-debris flying onto the ground. That's when I thought I'm really glad I take safety precautions like wearing eye protecti...

I poured 100 lbs of concrete!

Custom Building Products  is the name of the company who produces all of the flooring materials I have used so far. They include the waterproofing membrane, primer and concrete. I want to give a shout out to their technical support hotline at 800-272-8786. Prior to executing each step, I've called and consulted with the technical advisers at Custom. They've always been available, easy to talk to and given me direction and reassurance on how to execute each step. I am so thankful for their availability and assistance! First I applied the two different coats of waterproofing membrane. Second I applied a primer. Both of these steps were really easy. All I had to do was roll the liquids onto the floor. The waterproof membrane Finally, it was time to pour the concrete! I was most excited about this step because I've only done this once before, when I was a kid. I felt pouring concrete would be a great achievement in my DIY experience. Again, the guys at Custom gave...

Bunk Bed Completed!

We finished painting the bunk bed and we think it looks great! The paint went on really well and it feels nice and smooth. The bunk is held together by 4 inch lag bolts and I was not looking forward to having to wrench down each one of them by hand. So I asked good 'ole trusty Google if some sort of impact driver socket adapter existed. Lo and behold, yes! I found a cheap  adapter at Harbor Freight for $3 and it worked out quite well. I'd recommend getting a nicer one if you're going to be installing as part of your profession but if it's going to be a one off thing then this a great bet. It took about an hour for the four of us to assemble it (yes, I put the kids to work).