Tile install

I was nervous getting started on the tile because I'd never embarked on such a project in my entire life! But it was time, I had to and I wanted to make an attempt at installing it myself. As usual, I called the helpline line at Custom Building and went through the preparation and the procedure with them and they gave me the thumbs up.

I had to do it over two nights and the first night was quite difficult. I mixed up the mortar per the specifications and ended up with extremely thick mortar. It took a lot of effort to get it out of the bucket and then form it properly on the floor and apply it to the back of the tile (backbuttering). I think it took me about three hours to install about 12.5 sq. ft. No joke, it took that long. But it all went in and it all lined up. I even thought they were pretty level with each other. I had to stop by this point because it was about midnight.
The next day, I called Custom Building again and explained my problem with the thickness of the mortar. They suggested I add a little more water at the initial mixing phase and to aim for peanut butter like consistency.  For those of you who don't know me, I'm allergic to peanuts hence, I'm not familiar with peanut butter like consistency. That evening, I had to get an education on what that consistency looks like through opening a jar of peanut butter and stirring it up. I think I got it and discovered it sure was easier to manipulate!

A few nights later, I returned-itching to finish the job. I mixed up the mortar and got it thinner and more manageable. As I was installing the tile, I began to see the thinner consistency of the mortar was allowing the tile to sink further down than the tile I'd previously installed. (I had a feeling this was going to happen! I should have applied more mortar.) In addition, I think there was a slight low spot that I had missed. As a result, not all of the tiles were level with each other. But they all lined up straight and fit into the bathroom quite well. It still took me about three hours to finish.
I came back a few days later to finish with the grout and sealing. This part wasn't so bad. I was bummed about how uneven the tile was and tried to compensate by installing enough grout to have a short slope from one height to another and to minimize the tripping hazard. Sadly, the installation of the grout really gives away the unevenness of the tile. 

Oh well, this was my first attempt at such a project and I think I should take some pride in it. I'm an amateur and I got amateur results. I hope, if I have to do this again, it'll be better. 



This was my best section.





Comments

Post a Comment

Popular posts from this blog

Tile prep: The Challenge of Cutting Curves

I successfully made all of the straight cuts on the tiles but it was quite a process. After the first few cuts, I decided I would gradually cut my way towards the cut line. I kept cutting away portions of the tile until I got to where I wanted it to be. This worked quite well. All was going well until I had to start cutting the hole out of the tile to make way for the toilet. A Home Depot employee recommended I use a diamond tipped blade for a jig saw to make the cut. This way, it'll go faster and still be able to guide the cut along the curve. It didn't work very well. The blade barely got through the tile. I had to lean on the saw to get it to move, which it hardly did. It got so tiring I had to start taking breaks. Well, at one point as I lifted the saw away, the tile snapped in half! I stood there in shock! The tile had suddenly broken-debris flying onto the ground. That's when I thought I'm really glad I take safety precautions like wearing eye protecti...

I poured 100 lbs of concrete!

Custom Building Products  is the name of the company who produces all of the flooring materials I have used so far. They include the waterproofing membrane, primer and concrete. I want to give a shout out to their technical support hotline at 800-272-8786. Prior to executing each step, I've called and consulted with the technical advisers at Custom. They've always been available, easy to talk to and given me direction and reassurance on how to execute each step. I am so thankful for their availability and assistance! First I applied the two different coats of waterproofing membrane. Second I applied a primer. Both of these steps were really easy. All I had to do was roll the liquids onto the floor. The waterproof membrane Finally, it was time to pour the concrete! I was most excited about this step because I've only done this once before, when I was a kid. I felt pouring concrete would be a great achievement in my DIY experience. Again, the guys at Custom gave...

Bunk Bed Completed!

We finished painting the bunk bed and we think it looks great! The paint went on really well and it feels nice and smooth. The bunk is held together by 4 inch lag bolts and I was not looking forward to having to wrench down each one of them by hand. So I asked good 'ole trusty Google if some sort of impact driver socket adapter existed. Lo and behold, yes! I found a cheap  adapter at Harbor Freight for $3 and it worked out quite well. I'd recommend getting a nicer one if you're going to be installing as part of your profession but if it's going to be a one off thing then this a great bet. It took about an hour for the four of us to assemble it (yes, I put the kids to work).